200%;font-family:" arial","sans-serif""="">ABSTRACT
  This
 research project “Network Analysis as an effective maintenance planning tool”
 created a detailed evaluation of strategies and techniques for planning
 maintenance activities in the Nigerian process industry, laying focused
 emphasis on operations of Warri Refinery and the effectiveness of CPM Network
 analysis. A review of previous works related to maintenance planning was
 extensively undertaken and findings revealed the extent in which planning
 activities has been carried out in the oil and gas downstream sector. The analysis
 of related literatures showed that wrench time and equipment reliability were
 not considered by previous researchers. Field studies were then carried out to
 ascertain how these maintenance indices have been affected by CPM network
 planning. With the use of frequency tables, percentages, standard deviation and
 simple regression, data collected were analyzed accordingly. Results deduced
 from regression analysis and the simple t-test showed that CPM Network tool is
 effective in maintenance forecasting and equipment reliability at 5% level of
 significance. These analyses identified with great precision, the need for
 stakeholders in the process industry to fully inculcate project management and
 network planning tools into maintenance operations. Recommendations on
 integrating CPM Network tool and SAP ERP for effective maintenance planning was
 proffered. The study was concluded by inferring that innovative use of Network
 planning tools for maintenance activities would spur rapid growth and development
 of the Nigerian oil and gas downstream sector. Further studies on applying
 Network Techniques to aspects of maintenance such as Turnaround Maintenance
 (TAM), in Reliability Centered Maintenance (RCM) and Capacity Planning were
 suggested.
  TABLE
 OF CONTENTS
   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
Title
 Page - - - - - - - - - i   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
Certification
 - - - - - - - - ii   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
Dedication
 - - - - - - - - - iii   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
Acknowledgement
 - - - - - - - - iv   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
Abstract
 - - - - - - - - - v   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
Table
 of Contents - - - - - - - - vi   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
List
 of Tables - - - - - - - - ix   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
List
 of Figures - - - - - - - x   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
CHAPTER
 ONE - Introduction   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
1.1
 Background of the Study - - - - - - 1   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
1.2
 Statement of Problem - - - - - - 2   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
1.3
 Aim and Objectives of the Study- - - - - - 3   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
1.4Research
 Questions - - - - - 3   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
1.5 Statement
 of Hypothesis - - - - - - 4   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
1.6 Significance
 of Study - - - - - - 4   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
1.7
 Scope and Limitation of Study - - - - - - - 5   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
CHAPTER
 TWO - Literature Review   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.1
 Maintenance Planning Defined - - - - - - - 7   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.1.1
 Gantt Chart as a Planning Tool- - - - - - - -   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.1.2
 GERT Network Technique - - - - - -    justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.1.3
 Line of Balance font-family:" times="" new="" roman","serif""=""> - - - - - - - -  
 justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.2
 Historical Background of Network Analysis - - - - - - 8   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.2.1
 Critical Path Method (CPM) - - 10   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.2.2
 Project Evaluation and Review Technique (PERT) - - - - - 12   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.3
 Maintenance Planning and Project Management - - - - - - 16   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.4
 Maintenance Planning In the Nigerian Oil and Gas Industry- - - - 17   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.4.1
 Preventive Maintenance - - - - - 19   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.4.2
 Determining Maintenance Crew Size - - - - 21   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.4.3
 Scheduling Maintenance Jobs- - - - - 23   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.4.4
 Planning Maintenance Material - - - - 25   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.5
 Shutdown Maintenance as an Application of Network Analysis - - - - - 27   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.6
 Condition-Based Maintenance and Networked Maintenance Planning - - - - 28   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.7
 Current Trend in Networked-Based Maintenance Planning: A Critical Review - - - -
 - - -30   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
2.8
 Summary of the Literature Review - - - 32   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
CHAPTER
 THREE - Research Methodology   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.1
 Design of the Study - - - - 44   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.2 Methods
 of Data Analysis - - - - 44   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.3
 Source of Data Collection - - - - - - 44   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.3.1
 Primary Source - - - - - - - 45   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.3.1.1
 Oral Interview - - - - - - -45   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.3.2
 Secondary Source - - - - - - - 45   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.4
 The Study Area - - - - 46   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
3.5
 Study Population and Sample Size - - - - - 46   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
    justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
CHAPTER
 FOUR - Presentation and Analysis of Data   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
4.1
 Demography of Respondents/ Discussions of Findings- - - - - - - 48   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
4.2 Analysis
 and Results Using t-test and Simple Regression- - - - - 48   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
4.3 CPM
 Network Analysis using Practical Maintenance Activities- - - - - - 71   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
4.4
 Summary of Results and Discussions……………………….   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
CHAPTER
 FIVE – Recommendations, Summary and Conclusion   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
5.1
 Recommendations - - - - - - - 73   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
5.2
 Summary and Discussions of Findings   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
5.3Conclusion--
 - - - - - - - 73   justify;line-height:200%;mso-layout-grid-align:none;text-autospace:none">
5.4
 Suggestions for Further Research  References
 
    Appendix
  
 200%;font-family:" arial","sans-serif""=""> 
  
 200%;font-family:" arial","sans-serif""="">