Construction Management / Construction Technology Research Papers/Topics

THE DIFFERENCES BETWEEN STRUCTURED LANGUAGE AND UNSTRUCTURED LANGUAGE: PROGRAMING LANGUAGE

INTRODUCTIONA program in a non-structured language usually consists of sequentially ordered commands, or statements, usually one in each line. The lines are usually numbered or may have labels: this allows the flow of execution to jump to any line in the program.Non-structured programming introduces basic control flow concepts such as loops, branches and jumps. Although there is no concept of procedures in the non-structured paradigm[citation needed], subroutines are allowed. Unlike a procedu...

The Differences between Expressions of Interest (EOI), Invitation For Bids(IFB) and Tenders

line-height:107%;font-family:" times="" new="" roman","serif";mso-fareast-font-family:ABSTRACTThis paper discusses the meaning of the terms Expression of interest, invitation for bids and request for tenders. These terms are often used and hence a clear understanding of what they mean is cardinal to everyone whose day to day vocabulary involves these terms

Relationship between Material Management Approach and Scheduled Project Completion Time

AbstractConstruction projects are known to experience time delays due to various reasons. The aim of this study is to find out if the material management approach used on building projects has a relationship with the scheduled completion time of the projects. Various literatures were reviewed so as to identify the different material management techniques available and classification of time overrun. The study was carried out on building projects situated in Lagos and simple random sampling te...